Project Experience

Project NameClientWorks Involved
Drone Topographical Surveys for Oriang
Hydro Power Project in Murchison Falls Karuma
SINOHYRO CORPORATION LIMITED
Drone Topographical Survey for the
Reservoir area (80.16 km²) including the
Project site (16.45 km²) and Tailrace area
(1.96 km²)
Bathymetric Surveys for Oriang Hydro
Power Project in Murchison Falls Karuma
SINOHYRO CORPORATION LIMITEDRiver Cross-Section and Longitudinal
Section Survey: A total of 25 crosssections including 22 along the main stream of the reservoir area and 3 near the tailrace outlet
Geotechnical investigations for the
Proposed Additional Facilities at
KIkolongo Equator Line Point
SADRINE INFRASTRUCTURE SERVICES
LIMITED
Rotary drilling of Two (2No) boreholes to
a maximum depth of 10m, while
conducting SPT
Geotechnical investigations for the
Proposed Baringa bridge and slope
stability analysis on Koboko - Yumbe -
Moyo road upgrading project
ZHONGMEI ENGINEERING LIMITED
Electrical resistivity Tomography (ERT
Test)
Geotechnical Investigations by Plate
load Test for the Mini Arena at Akiibua
Olympic Stadium
SAMCO NATIONAL CONSTRUCTION
COMPANY
Plate Load Testing + Reporting
Thermal Conductivity Testing at the
EACOP Pipe line Project
CHINA PETROLEUM PIPELINE ENGINEERING
COMPANY
Thermal Resistivity Testing + Reporting
Geotechnical Investigations for the
Proposed development of a Residential
house, Block 195, Plot 6870 at Nakawa,
Kampala
M/s. WAKABALA SUZAN SYLIVIA
Test Pit Excavation + Dynamic
Probing Testing + Laboratory Testing +
Reporting
Geotechnical Investigations for the
Proposed development of a
Commercial Building, Block 12,Plot 160
in Mengo, Kampala
DARYEEL ENTERPRISES LTDTest Pit Excavation + Dynamic
Probing Testing + Laboratory Testing +
Reporting
Geotechnical Investigations for the
Storage Resservoir across Zwamba
Swamp in Ziwa and Royal Estates of
Kinyara Sugar LTD, Masindi district,
Uganda
KINYARA SUGAR LIMITEDRotary drilling of Twenty Six (26No)
boreholes to a maximum depth of 14m,
while conducting SPT+Plate load
Testing+ Field density
Testing+Laboratory Testing +
Reporting
Geotechnical Investigations by Plate
load Test for Akiibua Olympic Stadium
SAMCO NATIONAL CONSTRUCTION
COMPANY
Plate Load Testing + Reporting
Geotechnical Investigations for the
Proposed development of a Country
home, Block 356, Pot 906 at Makindu,
Buikwe district
Mr. ZACKARIA NGOBI
Test Pit Excavation + Dynamic
Probing Testing + Laboratory Testing +
Reporting
Geotechnical Investigations for the
Proposed developmrnt of a Classroom
Block for Donela Orange primary school
Wobulenzi
DONELA ORANGE PRIMARY SCHOOL
WOBULENZI
Test Pit Excavation + Dynamic
Probing Testing + Laboratory Testing +
Reporting
Geotechnical Investigations for the
Proposed Construction of Kudoz Hotel,
Bulagala, Kalangala
KUDOZ HOTEL
Test Pit Excavation + Dynamic
Probing Testing + Laboratory Testing +
Reporting
Geotechnical Investigations for Detailed
Design of Iganga-Bulopa-Kamuli Road
(56Km)
Dar Al Handash/ Arab Contractors
(Osman Ahmed Osman)
Borehole drilling + Lugeon +
Laboratory Testing +
Reporting
Geotechnical Investigations for the
Proposed Construction of a Distillery
Plant
HOIMA SUGAR LIMITED
Test Pit Excavation + Dynamic
Probing Testing + Electrical Resistivity +
Laboratory Testing +
Reporting
Geotechnical Investigations for the
Proposed development of the Coal
Drier and Mill
HIMA CEMENT FACTORYBorehole drilling+Plate load testing +
Electrical Resistivity+ Laboratory Testing
+Reporting
Geotechnical Investigations for Jecana
Safaris Lodge
BIG SOLUTIONS GROUPTest Pit Excavation + Dynamic
Probing Testing+Laboratory Testing +
Reporting
Geotechnical Investigations for Ituka
West Nile 20MWAC SPP, UGANDA
APTECH AFRICA LIMITED Thermal Resistivity Testing + Reporting
Geotechnical Investigations for the
Proposed Service Apartment on Plot 19,
Kitante Close
INTERIOR TECHNOLOGIES LIMITEDTest Pit Excavation + Dynamic
Probing Testing+Field density testing
+Laboratory Testing +
Reporting
Our Address

Bweyogerere
P. O. Box 153987, Kampala – Uganda

Contact Number

+256 761 647 323